List of CDF II Procedures

Safety Procedures (Safety Procedures)
[ Fermilab ES&H Section Home Page]Fermilab_logo
(Procedure Procedures )
(CDF Solenoids Cryo System Operational Procedures)
(Gas System Operational Procedures )
(CDF Mechanical Group Operational Procedures)
(CDF Electrical Group Operational Procedures)
(CDF Particle Instrumentation Group Operational Procedures)
(Other CDF Operational Procedures )
(CDF Technical guidelines and permits)


Safety Procedures:
(Numbered CDF II PROC-001 through CDF II PROC-100)
CDF II PROC-001 Emergency Response Procedures Approved
CDF II PROC-004 DF Supervised Access Procedure Approved
CDF II PROC-008 CDF Controlled Access Procedure Approved; 1 HPC made.
CDF II PROC-013 Sign-Off Procedure Required before Flowing Flammable Gas To or Turning High Voltage on the CDF Detector Subsystems Submitted to approval
Procedure Procedures:
(Numbered CDF II PROC-101 through CDF II PROC-199)
CDF II PROC-101 How to write a CDF Procedure Approved
CDF II PROC-106 CDF-II PROC - 106 "CDF Silicon Radiation Protection Procedure" Approved
CDF II PROC-110 “CDF Silicon Interlock Code Change Request” Approved; 1 HPC made.
CDF II PROC-111 CDF-II Oroc. 111 Process Systems Interlock Code Change Request Approved; 1 HPC made.
CDF II PROC-112 CDF COT Pressure Interlock Code Change Request Approved
Gas System Operational Procedures:
(Numbered CDF II PROC-301 through CDF II PROC-399)
CDF II PROC-311 CDF Gas Systems Procedure Approved
CDF II PROC-312 CDF Mixing Shed Gow Mac Zeroing and Calibration Approved
CDF II PROC-317 Isobutane Gas Sampling PRocedure Required for Isobutane Analyses Approved
CDF II PROC-318 "Procedure to Pressurize and Empty the CLC Detectors" Approved; 1 HPC made.
CDF II PROC-319 CDF-II PROC. 319 “Ethane Gas Analysis Procedure Required for Ethane Certification” Approved
CDF II PROC-320 Ethane Gas Sampling Procedure Required for Ethane Analyses Approved
CDF II PROC-321 ABB Gas Analyzer Procedures For Ethane Analyses and Maintenance Approved
CDF II PROC-322 ABB Gas Analyzer Analysis Calibration Procedure Approved
CDF Mechanical Group Operational Procedures:
(Numbered CDF II PROC-401 through CDF II PROC-499)
CDF II PROC-401 "CDF 1200 Ton Shielding Door Move Procedure" Submitted to approval
CDF II PROC-404 CDF Central Detector Move Procedure Submitted to approval
CDF II PROC-405 "Moving CMP Walls in the CDF Collision Hall" Submitted to approval
CDF II PROC-406 Moving a Central Arch in or out of the Central Detector Approved
CDF II PROC-407 "How to move a CMEX in the Collision Hall" Submitted to approval
CDF II PROC-414 Moving IMU Steel Approved; 1 HPC made.
CDF II PROC-414 Moving IMU Steel Approved
CDF II PROC-415 “Procedure for Maintenance and Repair of the CDF Electronics Approved; 1 HPC made.
CDF II PROC-416 “Operation of the CDF Electronics Cooling Water System” Approved; 1 HPC made.
CDF II PROC-417 Operation of the COT Endplate Cooling System Approved
CDF II PROC-420 Operation of the CDF CEM Source Calibration System Approved
CDF II PROC-423 Procedure for Operating the End Plug Source Drive System Approved
CDF II PROC-424 Plug Move Submitted to approval
CDF Electrical Group Operational Procedures:
(Numbered CDF II PROC-501 through CDF II PROC-599)
CDF II PROC-508 CDF-II PROC - 508 "CDF Procedure for Fire Alarm Testing and Maintenance " Submitted to approval
CDF II PROC-509 CDF Procedure for Hazardous Atmosphere Alarm System Maintenance Submitted to approval
CDF II PROC-514 Procedure to Operate the COT High Voltage Approved

CDF Technical guidelines and permits
CDF II PROC-702.TA CDF ODH Analysis
CDF II PROC-420.TA CDF CEM Source Operation Technical Guideline
CDF II PROC-002.TA CDF Operations Department Self Assessment Plan