| Safety Procedures: (Numbered CDF II PROC-001 through CDF II PROC-100) | ||
| CDF II PROC-001 | Emergency Response Procedures | Approved |
| CDF II PROC-004 | DF Supervised Access Procedure | Approved |
| CDF II PROC-008 | CDF Controlled Access Procedure | Approved; 1 HPC made. |
| CDF II PROC-013 | Sign-Off Procedure Required before Flowing Flammable Gas To or Turning High Voltage on the CDF Detector Subsystems | Submitted to approval |
| Procedure Procedures: (Numbered CDF II PROC-101 through CDF II PROC-199) | ||
| CDF II PROC-101 | How to write a CDF Procedure | Approved |
| CDF II PROC-106 | CDF-II PROC - 106 "CDF Silicon Radiation Protection Procedure" | Approved |
| CDF II PROC-110 | “CDF Silicon Interlock Code Change Request” | Approved; 1 HPC made. |
| CDF II PROC-111 | CDF-II Oroc. 111 Process Systems Interlock Code Change Request | Approved; 1 HPC made. |
| CDF II PROC-112 | CDF COT Pressure Interlock Code Change Request | Approved |
| Gas System Operational Procedures: (Numbered CDF II PROC-301 through CDF II PROC-399) | ||
| CDF II PROC-311 | CDF Gas Systems Procedure | Approved |
| CDF II PROC-312 | CDF Mixing Shed Gow Mac Zeroing and Calibration | Approved |
| CDF II PROC-317 | Isobutane Gas Sampling PRocedure Required for Isobutane Analyses | Approved |
| CDF II PROC-318 | "Procedure to Pressurize and Empty the CLC Detectors" | Approved; 1 HPC made. |
| CDF II PROC-319 | CDF-II PROC. 319 “Ethane Gas Analysis Procedure Required for Ethane Certification” | Approved |
| CDF II PROC-320 | Ethane Gas Sampling Procedure Required for Ethane Analyses | Approved |
| CDF II PROC-321 | ABB Gas Analyzer Procedures For Ethane Analyses and Maintenance | Approved |
| CDF II PROC-322 | ABB Gas Analyzer Analysis Calibration Procedure | Approved |
| CDF Mechanical Group Operational Procedures: (Numbered CDF II PROC-401 through CDF II PROC-499) | ||
| CDF II PROC-401 | "CDF 1200 Ton Shielding Door Move Procedure" | Submitted to approval |
| CDF II PROC-404 | CDF Central Detector Move Procedure | Submitted to approval |
| CDF II PROC-405 | "Moving CMP Walls in the CDF Collision Hall" | Submitted to approval |
| CDF II PROC-406 | Moving a Central Arch in or out of the Central Detector | Approved |
| CDF II PROC-407 | "How to move a CMEX in the Collision Hall" | Submitted to approval |
| CDF II PROC-414 | Moving IMU Steel | Approved; 1 HPC made. |
| CDF II PROC-414 | Moving IMU Steel | Approved |
| CDF II PROC-415 | “Procedure for Maintenance and Repair of the CDF Electronics | Approved; 1 HPC made. |
| CDF II PROC-416 | “Operation of the CDF Electronics Cooling Water System” | Approved; 1 HPC made. |
| CDF II PROC-417 | Operation of the COT Endplate Cooling System | Approved |
| CDF II PROC-420 | Operation of the CDF CEM Source Calibration System | Approved |
| CDF II PROC-423 | Procedure for Operating the End Plug Source Drive System | Approved |
| CDF II PROC-424 | Plug Move | Submitted to approval |
| CDF Electrical Group Operational Procedures: (Numbered CDF II PROC-501 through CDF II PROC-599) | ||
| CDF II PROC-508 | CDF-II PROC - 508 "CDF Procedure for Fire Alarm Testing and Maintenance " | Submitted to approval |
| CDF II PROC-509 | CDF Procedure for Hazardous Atmosphere Alarm System Maintenance | Submitted to approval |
| CDF II PROC-514 | Procedure to Operate the COT High Voltage | Approved |
| CDF Technical guidelines and permits | |
| CDF II PROC-702.TA | CDF ODH Analysis |
| CDF II PROC-420.TA | CDF CEM Source Operation Technical Guideline |
| CDF II PROC-002.TA | CDF Operations Department Self Assessment Plan |
lena@cdfsga.fnal.gov. | [ CDF II Procedures & Safety Review ][ CDF ] [ Fermilab ] |