CDF II Logo TOF Documents Page

Given below are recent documents on time of flight. They are separated into
notes, talks. and drafts.
In case you want documents added to this page please send the ps file to Christoph Paus (paus@fnal.gov).


Drafts for notes to be completed (top):

2000 October: First TOF readout signals (local)

Summary of recent talks (top):

2000 September: TOF Presentation at the Collaboration Meeting (local)
2000 May: TOF Presentation at the Collaboration Meeting (local)
1999 January: L00/TOF physics for PAC in January 1999 (local)

Summary of recent and older notes (top):

2000 November: PMT Test Stand Results (CDF-Server)
2000 November: DPF 200 Proceedings (CDF-Server)
2000 July TOF Electronics Review : Review (CDF-Server)
2000 July TOF Electronics Review: Phototube base design (CDF-Server)
2000 July TOF Electronics Review: Preamplifier design (CDF-Server)
2000 July TOF Electronics Review: Cabling, grounding and shielding (CDF-Server)
2000 July TOF Electronics Review: Low voltage power supplies (CDF-Server)
2000 June Conference Proceedings for Pisa Meeting (CDF-Server)
1999 October TOF funding for PAC (local)
1999 October Calibration System Layout (CDF-Server)
1999 October Scintillator Bar Measurements (Attenuation) (CDF-Server)
1999 September PMT Tests: Extension (CDF-Server)
1999 August TOF funding assessment for Italian Committee Meeting (local)
1999 July NIM publication of the test system results (local)
1999 June L00/TOF funding for PAC in June 1999 (local)
1999 May Initial PMT Tests (local, CDF-Server)
1999 January L00/TOF funding for PAC in January 1999 (local)
1998 October L00/TOF presentation to PAC in October 1998 (local, CDF-Server)
1998 September Simulation of a Time-of-Flight Detector for Physics Studies at CDF (CDF-Server)
1998 September B Hadron Flavor Tagging Using a Time-of-Flight Detector (CDF-Server)
1998 August A Monopole Trigger in Run II (CDF-Server)
1996 April Time-of-Flight Test System Performance (CDF-Server)


Modified: Tue Nov 21 14:35:41 CST 2000 Christoph Paus