Next:
Executive Summary
Up:
A Time-of-Flight System for
Previous:
A Time-of-Flight System for
Contents
Executive Summary
Introduction
Physics Goals and Performance Requirements
Mixing
K Spectrum from
Scintillator TOF system in the CDT location
Separation of
Choice of Scintillator and PMT
Readout Electronics
Preamplifier
Time Measurement
Charge Measurement
System Organization
Electronics Cost Estimate
Trigger Considerations
Cosmic Ray Tests of a Prototype TOF Counter
Tests of a Prototype TOF counter with a N laser
Counter Occupancy
Same-side
Opposite Side
Random Events
Occupancy in Run-II
Determination of and an Algorithm for Kaon Tagging
Track Z Uncertainty at 1.4 Meters
Expected Time Resolution for the Final TOF System
Other Potential Uses for the TOF System
Cost estimate and Schedule
Conclusions
Acknowledgments
References
Appendix A: Detector Choices
Appendix B: Magnetic Field tests of PMTs
Kaon Tagging in Run-Ia with dE/dx
About this document ...
CDF TOF Group
Tue Apr 4 10:44:30 CDT 1995