Minutes of DAQ/Online Calibration Meeting 07/07/00


Minutes of DAQ/Online Calibration Meeting 07/07/00
===================================================


THEME: Discussion of calibration package split and
       getting calibration consumers into validation.

The cut into online production is moving along.  Bill Badgett should have the
rundb in production the week of July 9. (Note, this did happen).

The cut into offline production was done and the next run of MDC2 should
use production.  

The biggest problem has been to get the grants sorted out.  For now we
are using external authentification although Rick Vidal is giving this a
lot of thought.  We will keep the number of accounts low and essentially
establish one per subdetector.

After the rundb is in, the only missing database is the trigger.  this
awaits development and integration testing anyway.

The calibration database package CalibDBTables which defines all the
tables was split into packages grouped by subdetector component.  The
split had one hitch that was repaired but broke development for one day.



Round Table: 
-----------
SVX:                                   Jean Slaughter/Steve Nahn
================================================================
Jean had nothing new

COT:                                   Ashutosh Kotwal/Bill Orejudos
====================================================================
Bill was on  night shift the night before and sent the following mail:

  I will be unable to attend the 9 am calibration meeting. Here is
a quick summary of what's new with COT calibrations:


   1) COT map classes will go in COTGeometry. All parties agree on this.
      The view to the hardware database has been modified to include
      the channel id info in the COTD banks. So there are now 3 ways
      of describing a channel:

       a) crate, slot, chip index (0-95)

       b) superlayer, cell, wire

       c) 9 bit word in headers of COTD bank (essentially superlayer
          bits 6:8, mod ID 0:5), 7 bit word in the data words
         (local cell number 4:6, wire number 0:3).

      The view was modified to deal with case c). Any consumer
      (YMON) getting
      COTD banks will be able to get description a) or b). Of course,
      given a), one can still get b), and vice-versa. CotCalibConsumer
      i set up to get a) from the front end, convert to b), and then
      put both a) and b) in the DB.

   3) STILL waiting for flat cables to be connected to repeater cards
     so that length calibration can ensue...



                                              Bill


DatabaseHardware:          Rick Vidal/Umesh Joshi
-------------------------------------------------
The Database machine was shipped and should get to fermilab
the week of 7/9.  There is a hitch in the fact that the business
services database is down for 4 days so it will be impossible to get the
machine even if it is on site until the database is back.

Rick asked about when it would be brought up.  The idea is that it
should come up as 8.1.6.1 and shortly after that, the production machine
should go to 8.1.6.1.  

Muon:                                  Kevin Lannon
====================================================
no report

Calorimeter/DBana:           Jack for Vaia Papadimitriou
===============================================
Olga is figuring out how to get the critical calorimeter calibration 
 data off the vax and into the production database.

LED/Source                        Phillipe Gris
===============================================
no report

CLC:                                   Alexei Safonov
-----------------------------------------------------
CLC wants to move on getting DBANA, maps and validation going.

Consumer:                          Kaori Maeshima
=================================================
no report

ShowerMax:                       Steve Kuhlmann
-----------------------------------------------
no report


Presentations
-------------

AOB