Meeting of 6/4/97

Status of Muon Modules

Prem Singh discussed plans for muon reconstruction. He is porting the stub-finding modules into the Run 2 framework, as well as the stub-track linking module. Jim Bellinger is working on a new IMU stub finding module. The stub modules will be revised for Run 2, but CMLNK will be rewritten, sharing geometry and trajectory tools with the new simulation.

Status of Silicon Bank creation

Joe Boudreau has written code to read Silicon D banks, and also create them and add digitized hits. He has tested this code with test patterns, and read D banks with test patterns into his visualization package. He has also set up tools for timing studies. Ping Yeh has these tools and will use them to create D banks from the new simulation. Similar work will be done for the COTD bank.

Status of Electron/Photon Modules

Bob Wagner discussed plans for electron/photon reconstruction. Stpana has been ported to the Run 2 framework by Liz S-K, and Bob is doing the same for Emclst and Elctrn. Bob is currently rewriting Emclst. It would help to have additional people for shower max reconstruction and simulation.