NEWS:
Beam studies on every other week will continue. New aces are being trained
now.
iFIX Upgade:
Mark said the new plan is to go to iFIX version 3.0 instead of 2.6. Since
D0 gain little by moving up from 2.5 to 2.6, version 3.0 was chosen.
We were told that so far version 3.0 is doing fine after release. Six iFIX
software keys are already ordered. Four of them are for CDF use.
The 4 iFix keys will be allocated to :
1) Jim Loskot's PC
2) PC at SiDet
3) Apacs test PC
4) iFixTest
EDA: Official words are 'EDA should work by just recompiling.'
Pictures: Jim will change pictures. We have to be careful since they
are not backward compatible. Also some subdirectories will
be changed.
Softwares: The iFix software is free since the costs are already included
in maintenance contract with Fermilab.
CAEN:
MUON:
Yeongdae said CMX got into wrong voltage somehow. At the moment HVMON does
not check HV limits.
SVX:
Andy said the L00 software trip did not generate trigger inhibit somehow
on August 17. He thinks it has to do with communication problem between
SVXIICON and CDF-S2.
Plug TEMP:
David said the CDFTEMP locked up after virus scane for the last 2 weeks,
even if we lowered the virus scan priority. We need to do something about
this.