NEWS:
The scheduled power outage and cooling water problems resulted in very little
data taking during the last two weeks. Steve said the lab schedule shows
the next shutdown is set to August 29.
PLUG:
After a lot of effort by Luciana and Margherita the trigger inhibit for
the Plug high voltage is working now. We need to make the CLC and the
Muon Scintillator systems follow the suit.
TOF:
Steve said Gervasio is investigating the Trigger Inhibit for the cases of out
of limits.
CES:
The HV feedback system for the Central Chambers is not working. Yeongdae
can not afford to work on it anymore since he is busy with his thesis work.
One peculiar thing about the program is that it works only at the beginning
when the MUON3 is rebooted. Steve is looking into the problem.
CHA:
Irina said one CHA channel is drifting about 100V. The channel was masked
off to exclude from the Trigger Inhibit. We need an access of 4 hours to fix
this problem.
ICICLE:
Margherita is working on integrating new GAMMA supplies. She can not use
her pc since the interference between Win2000, iFix3.0, Oracle and VB
cause fatal error state. She will work at one of the PC's in B0.
PSM:
Dan said the Trigger Inhibit for the power supplies for the VME crates are now
installed.