NEWS:
Steve said shots are more routine these days. A store with 3.9**31 was the
best in
a month. There are still problems with Pbar loss. Particularly, the lifetime
at 150GeV is quite poor. Recently, it got a little better. There was an
4 hour access to fix COT low voltage problems. However, this turned out to
be a readout problem.
Since we have 7 new pc's, we need to prioritize demands. The two
best candidates are CLC(PII 330 MHz) and PISABOX(PII 450MHz).
Oleg is coming back on July 1st. He will work on Trigger Inhibit stuffs for
Muon Scintillators.
DOCUMENTATION:
John said he sent e-mails to experts to encourage them to update
documentations and instructions. He urged experts to update the date in
documents after reviewing them even if there is no change made.
MUON3:
Yeongdae said he needs some down time to work on the feedback system at MUON3.
ICICLE:
The aforementioned problem with Margherita's PC is now solved. The conflicts
between softwares were removed by renaming some of her include files. She
needs some down time to work on the Gamma supply monitoring and the
Generator monitoring. She said the DB time stamp problem still exist. The
ICICLE collects data every ten minutes. However the browser shows the data
points every 6-7 minutes. We need to fix this problem soon.
PSM:
Dan thinks there is something wrong in between the power supplies and the
BnB boxes, which attaches to the monitor taps on the power supplies. Somehow
voltage measurements are wrong. He also mentioned that he needs to work on
PSM documentation to make it more user friendly which was requested by Kaori
and Andy. Shift crews need easy access to the information of relationship
between power supplies and detectors. Steve suggested the tool tip for this.