Monitoring Controls System meeting on March 4, 2003


Attendance:
Steve Hahn, Andy Hocker, Irina Shreyber, John Yoh, JC Yun

NEWS:
The ground fault problem at one of the 6 magnets forced a week shut down. They can not narrowed it down until the magnets are warmed up. The earlist shot setup estimate is on Sunday.

PLUG:
Since we failed to upgrade the iFix at the CDFEPHV, we tried to go back to the old version. We could not make it work either. There was a missing library and we could not compile the code. Shift crews had to control HV manually for several days. This problem was solved after Mark installed a Visual C++ studio version 6 and recompiled with the old iFix version.

SYSTEM:
Steve summarized his view of the CDF iFix system for long term and also for short term. Please look into this.

  • Steve's "MUST SEE" view of iFix at CDF.