NEWS:
The shutdown date is set to fix the Helium leak problems. It will start
on March 15 for 10 days. During the last week, the COT group reversed gas
flow and increased flow rate (30-40%) to study ageing. During the shutdown
the COT group will work on the chamber face to pull out a wire plane.
ICICLE:
Magherita said she is thinking about writing a script in C++ or Java to
get data directly rather than going through Larry's browser. The Icicle
is still crashing once in a while.
PLUG:
Luciana can work on the PLUG trigger inhibits during the shutdown without
intefering with data taking.
Trigger Inhibit:
Steve showed a list of work to do for Trigger Inhibit in his transparancy: