NEWS:
The long shut down is pushed back and more likely it would happen during
the summer.
Steve reported on the data base meeting(Oct 23.). Please look into his transparancies for this.
iFIX Upgrade:
MUON:
Yeongdae said he found some of the MUON iFix pictures can be closed without
being properly terminated. He will find a way to cure this problem.
One possibility is to remove the small 'X' buttons on pictures.
PLUGHV:
Margherita said she and Luciana are still working on the PLUGHV control
buttons. It's not working yet. Somehow it can not talk to the switch box.
PSM:
Marcin said Roberto is working on monitoring fan rotating speed. This will
be installed in the first and second floors of B0 in near future.
Eventually he will work on the fans in the collision hall.