L2CAL UPGRADE
 

FIRST RESULTS - June 14th 2007


These are the first results with data taken on June 13th with the L2CAL system in.
The plot shows L2MET - L3MET
Red line is the old system and the black is the new system.
This is very similar to what we have been expecting from simulation studies.

GOOD WORK EVERYONE !


 

 
Hard work doesn't guarantee success,
but improves its chances.
- B. J. Gupta