CDF II Logo Online Level-3: B0 3rd Floor Layout

The Level 3 trigger will be located in the 3rd Floor Computing Room of the Assembly Hall. Pictured is the projected layout of the Engineering Run system of late 1999. Each square represents a 2'x2' floor tile.

The move from the old system to the new system is described here.


Updated 14 January 2000 by Jeff Tseng