| November 19, 2004 | Trigger Hardware | ||
| Pulsar cluster path and PulsarMon status | Vadim | ||
| Status of L2CAL firmware | Monica | pdf ppt | |
| ShowerMax Pulsar and splitter status | Chris | pdf ppt | |
| Pulsar firmware update | Sakari | pdf ppt | |
| Pulsar plan before beam returns | Cheng-Ju | pdf ppt | |
| November 05, 2004 | Joint XFT Upgrade and Trigger Hardware | ||
| XFT stereo finder review | Terri Shaw | pdf ppt | |
| Finder algorithm and current plan for L2 output | Scott Holm | ppt | |
| Progress report on Pulsar algorithm node | Kristian Hahn | ||
| Progress report on Pulsar control node | Daniel Whiteson | ||
| October 22, 2004 | Trigger Hardware | ||
| SVT purity vs luminosity | Roberto Carosi | pdf ps | |
| Progress report on PulsarMon | Wojtek Fedorko | ||
| Pulsar firmware improvements | Sakari Pitkanen | pdf ppt | |
| Progress report on Pulsar ShowerMax | Chris Neu | pdf ppt | |
| October 08, 2004 | Trigger Hardware | ||
| Introduction/News | Roberto/Cheng-Ju | ||
| Status of the 3-track board | Chris | ps | |
| Summary of Pulsar Review | Cheng-Ju | ppt | |
| Pulsar Monitoring | Shawn | ||
| September 24, 2004 | Joint XFT Upgrade and Trigger Hardware | ||
| SLAM Board Design Spec | Richard Hughes | pdf ppt | |
| September 10, 2004 | Trigger Hardware | ||
| Pisa SVT upgrade status report | Alberto | ||
| Update on the TF/Pulsar upgrade | Jahred | ps | |
| Update on the HB upgrade | Ivan | ||
| SVT mezzanine status | Jahred/Mel | ||
| August 27, 2004 | Trigger Hardware | ||
| Introduction | Roberto/Cheng-Ju | ||
| XFT timing tests | Nils | ||
| Aborting non-SVT events | Anna Maria | ||
| Pulsar commissioning experience and system timing measurements | Burkard | pdf ppt | |
| August 13, 2004 | Trigger Hardware | ||
| SVT Status and Plans | Roberto | ||
| Optimizing XFT Firmware Loading | Kevin Lannon | pdf ppt | |
| XFT Timing Test Run Request | Nils Krumnack | ||
| L2 Pulsar BeamTest Plans | Burkard Reisert | pdf ppt | |
| July 16, 2004 | Trigger Hardware | ||
| Trigger new | Roberto | ppt | |
| Status report on the 3-track trigger board test | Chris Marino | ps | |
| Status report on raising XFT pT threshold | Kevin Lannon | pdf ppt | |
| Study of L2 algorithm processing time on different CPU platforms | Kristian Hahn | ||
| June 18, 2004 | Trigger Hardware | ||
| Update on L1 TrigMon | Dan Cyr | ps | |
| Beam width monitor | Chris Neu (TBC) | ppt | |
| Road Warrior status | Roberto Carosi | ps | |
| Summary of the SVT upgrade workshop | Roberto Carosi | ps | |
| June 04, 2004 | Trigger Hardware | ||
| Pulsar isolation beamtest results | Vadim | ||
| L2 TrigMon (PulsarMon) design specs | Vadim | ||
| Pulsar production and testing status | Burkard | ||
| SVT News | Roberto | ||
| SVT timing studies | Ivan/Alex | ||
| Status of svtsim | Alex (TBC) | ||
| May 21, 2004 | Trigger Hardware | ||
| Pulsar production board status | Burkard Reisert | ppt | |
| LVDS cable splitting plan | Wojtek Fedorko | ps | |
| SVT Road Warrior installation plan and status | Roberto Carosi | ||
| TS->Pulsar->L2 CPU->Pulsar->TS Chain | Cheng-Ju Lin | ppt | |
| CPU choice for L2 upgrade + node control/monitoring | Kristian Hahn | ||
| node control/monitoring | Kristian Hahn | ||
| CPU choice | Kristian Hahn | ||
| April 09, 2004 | Trigger Hardware | ||
| TrigMon and DQM Interface | Charles Plager | pdf ppt | |
| SVT Status and L2DTO Study | Taka Maruyama | pdf ppt | |
| L2 Status | Peter wittich | ||
| February 27, 2004 | Trigger Hardware | ||
| Status of SVT Improvement (track counter) | Taka Maruyama | pdf ppt | |
| Study of L2DTO Events in Error Stream | Matt Worcester | ps | |
| Status of L2 Pulsar Muon and Plan for Fiber Splitting | Burkard Reisert | ppt | |
| Fiber Splitting | Chris Neu | ppt | |
| February 13, 2004 | Trigger Hardware | ||
| Annoucements | PW/CJL | ppt | |
| Tracklist | David/Charles | ppt | |
| SVT | Alex | pdf ppt | |
| SVT Improvement (trk counter) | Taka | ppt | |
| January 16, 2004 | Trigger Hardware | ||
| XFT Efficiency | Kevin L | pdf ppt | |
| TrigMon Status | Charles P | pdf ps.gz | |
| December 05, 2003 | Trigger Hardware | ||
| XFT efficiencies from data | Kevin L | pdf ppt | |
| Z -> bbbar | Mel S | ||
| L3 5.1.0 Validation (update) | Gilles De Lentdecker | pdf ps | |
The CMU-CMU di-muon trigger has had a 30-50% increase in rate at L1, but no increases were seen at L3. Unbiased data samples didn't show any signs of problems. Mysterious.
A special test run taken w/o L2 or L3 was taken. The simulation said that the data was ok (all data were correctly accepted) and no chamber-level problems were observed, either. The single-muon trigger rate looks ok.
Next: incorporate CSX into the trigger.
Efficiency studies on W candidates show good efficiency for CSX: 1280/1300 W's had good CSX trigger. CMU-CSX is 97.5% efficient
Rate reduction is proportional to the luminosity, and is a factor of 3-5 rejection. All CMX trigger will have a CSX requirement.
L2 muon board status: Fred Niell
| Prefred Input | Current Clock delay | Proposed Clock delay | |
|---|---|---|---|
| 0 | BSC 1,2 | +2 | +7 |
| 1 | BSC 3,4, RP | +0 | +5 |
| 2 | MP-E | +2 | +7 |
| 3 | MP-w | +2 | +5 |
| 4-7 | COSMIC TOF | 0 | |
| 8-11 | Multi TOF | 0 |
Also change the total Fred delay to zero (currently +4 +dialin). JDL will make some cables for the TOF trigger.