Back to Trigger Home.

Minutes and Slides from Trigger Hardware Meetings


November 19, 2004Trigger Hardware
Pulsar cluster path and PulsarMon status Vadim pdf
Status of L2CAL firmware Monica pdf  ppt
ShowerMax Pulsar and splitter status Chris pdf  ppt
Pulsar firmware update Sakari pdf  ppt
Pulsar plan before beam returns Cheng-Ju pdf  ppt
November 05, 2004Joint XFT Upgrade and Trigger Hardware
XFT stereo finder review Terri Shaw pdf  ppt
Finder algorithm and current plan for L2 output Scott Holm ppt
Progress report on Pulsar algorithm node Kristian Hahn pdf
Progress report on Pulsar control node Daniel Whiteson pdf
October 22, 2004Trigger Hardware
SVT purity vs luminosity Roberto Carosi pdf  ps
Progress report on PulsarMon Wojtek Fedorko pdf
Pulsar firmware improvements Sakari Pitkanen pdf  ppt
Progress report on Pulsar ShowerMax Chris Neu pdf  ppt
October 08, 2004Trigger Hardware
Introduction/News Roberto/Cheng-Ju pdf
Status of the 3-track board Chris ps
Summary of Pulsar Review Cheng-Ju ppt
Pulsar Monitoring Shawn pdf
September 24, 2004Joint XFT Upgrade and Trigger Hardware
SLAM Board Design Spec Richard Hughes pdf  ppt
September 10, 2004Trigger Hardware
Pisa SVT upgrade status report Alberto pdf
Update on the TF/Pulsar upgrade Jahred ps
Update on the HB upgrade Ivan pdf
SVT mezzanine status Jahred/Mel pdf
August 27, 2004Trigger Hardware
Introduction Roberto/Cheng-Ju pdf
XFT timing tests Nils pdf
Aborting non-SVT events Anna Maria pdf
Pulsar commissioning experience and system timing measurements Burkard pdf  ppt
August 13, 2004Trigger Hardware
SVT Status and Plans Roberto pdf
Optimizing XFT Firmware Loading Kevin Lannon pdf  ppt
XFT Timing Test Run Request Nils Krumnack pdf
L2 Pulsar BeamTest Plans Burkard Reisert pdf  ppt
July 16, 2004Trigger Hardware
Trigger new Roberto ppt
Status report on the 3-track trigger board test Chris Marino ps
Status report on raising XFT pT threshold Kevin Lannon pdf  ppt
Study of L2 algorithm processing time on different CPU platforms Kristian Hahn pdf
June 18, 2004Trigger Hardware
Update on L1 TrigMon Dan Cyr ps
Beam width monitor Chris Neu (TBC) ppt
Road Warrior status Roberto Carosi ps
Summary of the SVT upgrade workshop Roberto Carosi ps
June 04, 2004Trigger Hardware
Pulsar isolation beamtest results Vadim pdf
L2 TrigMon (PulsarMon) design specs Vadim pdf
Pulsar production and testing status Burkard pdf
SVT News Roberto pdf
SVT timing studies Ivan/Alex pdf
Status of svtsim Alex (TBC) pdf
May 21, 2004Trigger Hardware
Pulsar production board status Burkard Reisert ppt
LVDS cable splitting plan Wojtek Fedorko ps
SVT Road Warrior installation plan and status Roberto Carosi pdf
TS->Pulsar->L2 CPU->Pulsar->TS Chain Cheng-Ju Lin ppt
CPU choice for L2 upgrade + node control/monitoring Kristian Hahn pdf
node control/monitoring Kristian Hahn pdf
CPU choice Kristian Hahn pdf
April 09, 2004Trigger Hardware
TrigMon and DQM Interface Charles Plager pdf  ppt
SVT Status and L2DTO Study Taka Maruyama pdf  ppt
L2 Status Peter wittich pdf
February 27, 2004Trigger Hardware
Status of SVT Improvement (track counter) Taka Maruyama pdf  ppt
Study of L2DTO Events in Error Stream Matt Worcester ps
Status of L2 Pulsar Muon and Plan for Fiber Splitting Burkard Reisert ppt
Fiber Splitting Chris Neu ppt
February 13, 2004Trigger Hardware
Annoucements PW/CJL ppt
Tracklist David/Charles ppt
SVT Alex pdf  ppt
SVT Improvement (trk counter) Taka ppt
January 16, 2004Trigger Hardware
XFT Efficiency Kevin L pdf  ppt
TrigMon Status Charles P pdf  ps.gz
December 05, 2003Trigger Hardware
XFT efficiencies from data Kevin L pdf  ppt
Z -> bbbar Mel S pdf
L3 5.1.0 Validation (update) Gilles De Lentdecker pdf  ps

Oct 24, 2003

Shutdown Status

Sep 5, 2003

Shutdown plans

Aug 29, 2003


June 20, 2003


May 9, 2003

Meeting dedicated to discussing trigger bandwidth, continued. Goal of this meeting was to discuss what the list of possible improvements for speeding up various subsystems for maximal `physics-to-tape.'

April 25, 2003

Meeting dedicated to discussing trigger bandwidth. Other tidbits:

Mar 28, 2003 @ 10 AM - note new time!

The meetings will now only be held of off-weeks from 10-11am.

Mar 21, 2003


Jan 31, 2003


Jan 24, 2003

L1 advanced muon planning meeting, which resulted in this plan, jonathan's list of of parameters for the XTRP-muon interface. (As an aside, here is the XTRP-TOF information from mike.)

December 13, 2002

Quick reports.
  1. L1 muon advanced options.
  2. L2 muon board
  3. Prefred
  4. Fred: new FPGA design pending recovery of FPGA PC
  5. Readout lists. During testing of the full, final implentation of readout lists with beam and the default trigger table, we found that we were unable to take data due to L1 Done TO's. This was unexpected as the no-beam tests with the SRC had not shown any problems. TS, Si DAQ and SRC experts were on-hand (M. Schmidt, S. Nahn, L. Miller) and spent some time investigating the problem. These tests will continue during the next studies period. From the trigger and DAQ point-of-view, all the pieces are in place.
  6. Freeze/unfreeze of trigger table: With the successful migration of the L3 executable to offline version 4.8.4, the trigger table is now open for new modifications and improvements. Current to-do list is

December 6, 2002

  1. Readout List Status and Final Plan
  2. Improved L1 Muon Options Status
  3. Advanced L1 Muon Options Status
  4. New L1 Triggers - Status and Plan -- see readout list link above.
  5. Your favorite topic as time permits

November 29, 2002

Meeting cancelled - Thanksgiving.

November 22, 2002


November 15, 2002

Meeting cancelled.

November 8, 2002

Planning for new L1 triggers


November 1, 2002

  1. Muon trigger status report and discussion - Stephen, Fred et al. Steady progress has been made on the L2 muon board. The board contains four data buses:
    1. Into the Hotlink from the matchbox,
    2. VME bus,
    3. Magic Bus,
    4. Internal Bus.
  2. Outline of plans for L1 Muon bits - Jonathan
  3. Pulsar status report - Sakari

Oct 25, 2002 @ 9.30 AM -- note new time

  1. Breaking News
  2. New L1 Trigger Status
  3. Planning DAQ deadtime scans with beam time

Oct 18, 2002

Meeting cancelled.

Oct 11, 2002

  1. Brief sub-system reports and breaking news
  2. L1 muon status report: Eric James.
  3. Options for reducing L2 muon x-section by reworking L1.( Also see JDL talk on November 15, 2001.)
  4. L2 muon board status: Fred Niell


Oct 4, 2002

  1. Test stand status - Cheng-Ju
  2. Pulsar Status - Sakari
  3. Alpha firmware status - Stephen

Sept 27, 2002

Meeting cancelled.

Sept 20, 2002

  1. Readout lists: Tests indicated that TSID and TMPD agree but are attached to one event later than expected in the TL2D. Andrew M. is investigating.
  2. Dynamic Prescaling: ready to run in parasitic mode to gather more information about program and its predictions.
  3. TrigMon: Isolist and Clist plots fixed. Carla sees error in her TrigMon log file, which is not understood.
  4. JDL reports that the L1 CMU-CMU trigger rate has gone up by 50%. Eric James has investigated but no cause is evident. Will request test run to get data to check this out.
  5. ModSim simulation- Michael Schmidt
  6. SVT status - Marco R.

Sept 13, 2002

  1. Readout lists- Greg, Arnd and Peter tested readout lists. We managed to send ROL from the L2 Alpha to the TS to the FE crates. TrigMon subscribed to and received only events with the appropriate ROL. Offline analysis showed that the TSID and TMPD banks agreed (up to one discrepancy) what the ROL should be. TL2D was mysteriously zero in all but one case (though the Alpha sets the ROL?), though this is only a cross-check (and we think we understand why it wasn't getting filled.)
  2. Dynamic Prescales- Ke is to check how the rates are calculated and we will rerun the DPS code in a non-intrusive fashion to learn what it is doing.
  3. TOF trigger- Mike M.
  4. Timing in the diffractive triggers- Koji and Carla. Plan is to use "spy cable" and scope to see what the timing currently is to understand the current situation.
  5. L2 update- Stephen

Sept 6, 2002

Not held due to collaboration meeting.

Aug 30, 2002

  1. L1 cal trigger access report - Carla/Peter
  2. Summary of Alpha work this week - Stephen
  3. Implementing Readout List:

Aug 23, 2002

  1. Progress report and near term plan for L2 Muon card - Fred N.
  2. Status of the L2 calorimeter trigger
  3. MODSIM Simulation of CDF II Trigger/DAQ - Michael S.

Aug 18, 2002

  1. News and L1, L2 system reports - All
  2. Status of and plan for timing in BSC and miniplug for diffractive triggers - Koji and Carla

Aug 9, 2002

  1. Status Report on TOF trigger timing
  2. Status Report on Diffractive Trigger Timing
  3. Status Report on TOF/Diffractive PreFRED firmware
  4. Proposal for a new Forward Gap + TOF trigger. Mike Albrow presented a new trigger (see CDF5360). This is a feasible L1 scenario: He will report back with some preliminary numbers based on this.

Aug 2, 2002


July 19, 2002

  1. L2 Pager Report and Plan
  2. L1 Calorimeter Status - Maria S
  3. TOF Trigger Timing - Mike M
  4. Diffractive Trigger Timing - Koji T
  5. Diffractive/TOF Timing discussion

July 12, 2002

  1. No Meeting - SVT Trigger Workshop

July 5, 2002

  1. No meeting - July 4th Holiday!

June 28, 2002

  1. L1 Muon Status - Eric James
  2. L2 Muon Interface Status - Fred N.
  3. L2 Pulsar Status - Ted Liu
  4. L2 Decision Status and Work Plan

June 21, 2002

  1. L2 Optimization

June 14, 2002

  1. Meeting Cancelled

June 7, 2002

  1. L2 Work Reports:
  2. L2 Pulsar Firmware - Peter W.
  3. L2 Muon Interface Status - Fred N.

May 31, 2002

  1. No meeting - collaboration meeting

May 24, 2002

  1. L2 Pulsar Mezannine Card Status - Natalia K.
  2. Trigmon XFT Plots Update - Cheng-Ju
  3. L2 Status Reports
  4. L1 Status Reports
  5. L1 and L2 work plans for June Shutdown

May 17, 2002

  1. DCAS backplanes: past, present and future
  2. Performance of improved RECES with beam and MBUS arbitration
  3. L2 latency with (beam and Si and) MBUS arbitration
  4. L1 and L2 work plans for June Shutdown

May 10, 2002

  1. RECES Test Results - Masa
  2. L2 Pulsar Status Report - Ted Liu
  3. L1 Status Reports - ran out of time

May 3, 2002

  1. L2 Pager Report
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of L2 Trigmon Improvements - Nate G
  4. Status of L2 Cal (ncl ISO)
  5. SVT Status - Luciano
  6. L1 Cal Status
  7. XFT Status
  8. XTRP Status
  9. L1 Muon Status

April 26, 2002

  1. L2 Pager Report - Matt
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of Signal Splitting - Peter, Jonathan, Greg
  4. Status of Trigmon Improvements - Matt, Nate G, Greg, Peter
  5. L1 News

April 19, 2002

  1. L2 Pager Report
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of Trigmon Imnprovements - Matt, Nate G, Greg, Peter
  4. L2 Muon Interface Status - Fred Niell

April 12, 2002

  1. L2 Pager Report - Matt
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of Signal Splitting - Peter, Jonathan, Greg
  4. Status of Trigmon Imnprovements - Matt, Nate G, Greg, Peter
  5. L1 News

April 5, 2002

  1. L2 Pager Report
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of Signal Splitting - Peter, Jonathan
  4. L1 News

March 29, 2002

  1. L1 Activities
  2. L2 Pager Report
  3. Update on MagicBus Tests - Stephen, Greg, Matt...
  4. Status of Signal Splitting - Peter, Jonathan
  5. Status of L1 TOF Trigger Board - Mike Mulhearn

March 22, 2002

  1. L2 Pager Report - Peter W
  2. Update on MagicBus Tests - Stephen, Greg, Matt...
  3. Status of Signal Splitting - Peter, Jonathan

March 15, 2002

  1. Update on MagicBus Tests - Stephen (also in PowerPoint)
  2. Calorimeter Trigger Monitoring - Peter/Greg/Carla

March 8, 2002

  1. Update on MagicBus Tests - Stephen, Matt, Greg
  2. Plans for Monitoring and GoodRun List - Greg
  3. Calorimeter Trigger Monitoring - Peter - see March 15, 2002

March 1, 2002

  1. Update on MagicBus Tests - Stephen, Matt, Greg
  2. Update on Trigger Database - Jonathan for Peter

Feb 22, 2002

  1. Level 2 Teststand design:
  2. Level 2 Teststand Needs - Board designers

Nov 29, 2001

  1. L1 News
  2. L2 News - reported by Stephen, Monica and Steve K

Nov 22, 2001

Thanksgiving - no meeting.

Nov 15, 2001

  1. News
  2. Status of L2 Muon Interface- Fred Niell
  3. Getting Close to cdf4718 without the L2 Muons Interface- Jonathan

Nov 8, 2001

  1. News

Nov 1, 2001

  1. News:
  2. XFT Database Use: what goes in HDW, Run Cond or Trigger - Evelyn T
  3. SVT Database Use: what goes in HDW, Run Cond or Trigger - Bill A

Oct 25, 2001

  1. News
  2. Global Parameters for Trigger Database - Discussion led by Peter

Oct 18, 2001

  1. News - L1 and L2
  2. Proposals for New L2 Teststand Boards:

Oct 11, 2001

  1. News
  2. Status of L2SIM And L2MON - Nathan G
  3. Discussion of Validating L1 Functionality

Oct 4, 2001

  1. No Meeting

Sept 27, 2001

  1. News
  2. Are we ready to cut on Jets?

Sept 20, 2001

  1. News

Sept 13, 2001

  1. News
  2. MagicBus Measurements - Myron (TBC)

Sept 6, 2001

  1. News
  2. Status of L1 Track Trigger Tests - Kevin Pitts

Aug 30, 2001

  1. News
  2. XTRP Initialization - Nathan Eddy

Aug 23, 2001

  1. News
  2. L1 Muon Trigger Initialization - Eric James

Aug 16, 2001

  1. News
  2. L1 Muon Trigger Status - Eric James

Aug 9, 2001

  1. News

July 19, 2001

  1. News
  2. Suggestions for Improving TRIGMON - Jonathan Lewis

July 12, 2001

  1. News

July, 5 2001

  1. No Meeting

June 28, 2001

  1. XTRP Signoff for New Data Boards - Kevin Pitts
  2. News

June 21, 2001

  1. News

June 14, 2001

  1. News

June 7, 2001

  1. News

June 7, 2001

  1. News

May 31, 2001

Collaboration Meeting Parallel Session
  1. Diagnostic/Alternate Readout Lists
  2. L2 Trigger Status and Planning

May 24, 2001

  1. Survey of Level 1 and Level Status

May 17, 2001

  1. News
  2. XTRP Performance in 36x36 Run Data - Kevin
  3. Muon Trig Performance in 36x36 Run Data - Eric
  4. Web Page Improvements - Peter Wittich (5min)
  5. L2 Trigger Plans for Upcoming Run - All (25min)

May 10, 2001

  1. News
  2. Survey of L2 Diagnostic Software
  3. XFT Performance in 36x36 Run Data - Evelyn
  4. XFT-L3 Track Comparison - Erik Brubaker

May 3, 2001

  1. News
  2. Survey of L2 Diagnostic Software
  3. L1 Calorimeter Performance in 36x36 - Carla
  4. XFT-L3 Track Comparison - Erik Brubaker

April 26, 2001

  1. News
  2. Discussion:

April 19, 2001

  1. News
  2. Trigger Database - Alexei Varganov . Also available in
  3. Trigger Table for 36x36 - Peter Wilson . Also available in Power Point.

April 12, 2001

  1. News
  2. Requests for Trigger Table(s) in 36x36 Stores - Discussion Updated version including comments from meeting.
  3. Status of Forward Detector Triggers - Koji Terashi
  4. PreFRED Bits for 36x36 - Greg Feild

April 5, 2001

  1. News - results from 1x8 Stores
  2. Plans for L2 for Next 6 weeks

March 29, 2001 - Trigger Monitoring and Debugging Tools part 2

  1. News
  2. XTRP Monitoring and Tools - Kevin/Nathan (10 min)
  3. Muon Tigger Monitoring and Tools - Eric J (10min)
  4. SVT Monitoring and Tools - Marco R (10 min)
  5. Cluster Finder Monitoring and Tools - Monica/Steve K (10 min)
  6. L2 Decision Monitoring and Tools - Stephen M (10 min)

March 22, 2001

  1. News
  2. L1 Muon Status
  3. XFT Status
  4. XTRP Status
  5. L1 Cal  Status

March 15, 2001 - Focus on Trigger Monitoring and Debugging Tools

  1. News
  2. TRIGMON - Matt W
  3. TRIGSIM - Simona R
  4. L1 Calorimeter and Decision Monitoring and Tools - Carla P
  5. XFT Montoring and Tools - Jong-Young
  6. Example output log file

March 8, 2001

  1. News - YKK told us that only a portion of the SVX will be cabled for the end of March running. Currently the cabled region includes wedges 6, 7, and 8 of the Central barrel.
  2. L1 Decision Status - Greg F
  3. L2 Cal Status - Monica T
  4. SVT Status - Bill A
  5. L2 Decision Status - Stephen M
  6. Discussed agendas for future meetings: agreed to focus on Triger Monitoring and debugging tools for the March 15 and March 29 meetings.

March 1, 2001

  1. News
  2. Operations Plan: Pagers, Experts Etc - Luciano
  3. Plans for B0 VME Teststands - Peter


February 22, 2001

  1. News
  2. XFT Status - Evelyn
  3. XTRP Status - Kevin
  4. L1 Calorimeter Status - Maria/Nancy
  5. L1 Muon Status - Eric

February 15, 2001

  1. News
  2. Near Term L1 and L2 Goals - Ted/All
  3. TDSWG Request for Triggers - Peter


February 8, 2001

  1. Trigger Meeting Plan - Peter
  2. XFT Status - Evelyn

Back to Trigger Home.


Trigger SPL's
Last modified: Fri Nov 19 17:36:40 CST 2004