1.Location-
B0 (FL-NW).
·It
is quitenear control room !
2.Hardware(on
hand):
·Crate
Type A 10U CDF
·Power
source( +12V,+5V,
+3.3V,-12V )
·CPUMVME
162-532(B0svttest00)
·Oscilloscope
(HP Infinium)
3.SVT
spare modules (on hand):
·AMS -
1 (for test stand)
·Amboard-
5
·Amplug-
64
·Merger-
1 (for test stand)
·SPY-
4
·HB-1
(for test stand)
4.Status
of test stand:
·Standard
tests for AM systemworks.
(Am_test_vme,
Am_test_data_loop, random tests)
·Investigation
the reasons ofAM bugs during commissioning
RUN in progress.
5.Real
measurements the timing of AMBOARD:
àNo
problemsatGLUE2,
GLUE1 level
àCritical
part- GLUE0!
But,relative
positions for edges of signals CLKA, CLKB, CLK1, CLK3 can be improved!
See
oscilloscope snapshot 1 and snapshot
2
6.Summary
of testingfaulty Amplug fixed during
commissioning RUN:
We have 34faulty amplug (from 592 amplug in total ):
à26
– small different timing ( no problem)
à6
– fatal errorsinside amchips (R/W
opc – 4,
differentpatterns
– 2)
à2
– timing too different
7.Questions/problems
The