Electronics Job List
Electronics Job List for the Start of Run II
-
CDF_CLK and TDC_CALIB Termination modification for crate
backplane - Roberto, Orlando
-
Still need to do teststands in B0: Calorimeter, TOF, COT Cleanroom, Muon Trigger
- Need to make sure all Testclk modules are modified like TRACERs
-
Task description:
-
Remove TRACER and replace with modified board that has termination
resistors on CDF_CLK and CDF_CLK* also on TDC_CALIB and TDC_CALIB*
-
Remove transition cards from rear of crate for slots 1-5
and 18-21.
-
Remove termination SIPs from rear backplane and replace with
modified SIP
-
Test that termination is 50 Ohms
-
Detector Infrastructure
-
Separate 400 Hz and 60 Hz control from Slow Controls
-
Provide separate "Off" buttons for each in IFix (I&I + Duane) - In progress
-
Install crate(s) for Forward Detectors (Feb?)
-
Counting room infrastructure:
-
Power supply assembly/testing/installation
-
Convert two Model 1 Alacrities to become Model 5 - Roberto
(Jan-Feb in progress)
-
Spare will be adusted as model 5a (high current -5.2V)
-
Convert one Model 1 Alacrity to become Model 4 - Roberto (Feb after Model 5s)
-
Assemble 2 Vicor supplies for CLC and Calorimeter Calibration
crates- Roberto (Feb)
-
Assemble a test load for Vicor supply - Roberto (Feb)
-
Assemble power supply harnesses for CLC, Calorimeter Calib and Forward detector crates - Rene or Orlando (Feb)
-
Install all of above
-
Rabbit Power supply repair (John Bell + Roberto?)
-
Cable assembly/repair work:
-
MVME712 module flat cables - Redo DAQ VRB
-
Cable Dressing/redressing
-
Rework HADASD -> Patch Panel cables (Orlando + Shift
crew?)
-
Replace latches with screws at patch panel
-
Calorimeter Calibration crate - CHA/WHA Laser Reference PMT cables
reach
-
Cables will need to be 50ft long
-
Need 2600 ft of RG174 + 26 lemo + 26 Radial connectors
-
Will need 1 HADASD transition board + 2 ADMEM transition board
-
Diagnostic ethernet for FIB and Plug racks (Feb)
-
Reconfigure DAQ VRB racks for reset module (Roberto)
-
Hadron ASDs:
-
Modify power supply filtering -
-
Install ASDs - Rick
-
Install patch panels and Patch-panel to TDC cables (with
above cable rework) - Orlando + Helper - Feb
-
Install Trigger Inhibits patch panel and test inhibits (JDL)
-
Power Supply monitoring installation and checkout:
-
Central Detector Power supply and monitoring debugging (Rene, Roberto, Duane)
- Feb-March
-
Install long Cables for SVX FIB and Muon (Dervin)
-
Local Cabling and boxes for CMP/CMX/IMU and FIB racks - Rene + Duane
-
Clock fanout crate monitoring - JDL + Chappa
-
Work on electronics storage - need more crates
-
Set up teststand area on 2nd floor
-
Need room layout
-
Add one more Trigger crate
-
Install calorimeter teststand crate in 1RR30H
-
Cut out side panel of rack
-
Add rack protection to rack
-
Remove 1RR30I and put in floor tile
-
Install VIPA crate, SDM crate, NIM crate?
Updated by Peter Wilson 2/2/01