Annual Electronics/DAQ upgrade Workshop ======================================== Time: Oct 27-29 (Mon-Wed), 1997 Place: University of Michigan, Ann Arbor ********** * Oct 27 * ********** Time ==== 8:30 - 8:45 Welcome Myron Time ==== 8:45 - 12:30 Status of subsystems which are close to starting production (ADMEM, DIRAC, COT ASD, TDC, SVX DAQ, TRACER, VRB) - Brief status - Unresolved issues, problems, useful lessons - Current schedule 8:45 - 9:20 ADMEM Charlie Nelson 9:20 - 9:45 DIRAC Mel Shochet 9:45 - 10:10 COT ASD Kevin Pitts 10:10 - 10:45 TDC Myron Campbell 10:45 - 11:10 ** Coffee Break ** 11:10 - 11:50 SVX DAQ Colin Gay 11:50 - 12:30 TRACER, VRB & Vertical Slice Test Jim Patrick 12:30 - 1:30 ** Lunch ** Time Session Chairs ==== ============== 1:30 - 6:00 GWF & PJW 1:30 - 2:10 Timing-in signals & synchronization - Do we have enough adjustability in the current design? Summary talk on TRACER, Clock and TSI Peter Wilson Summary talk on SRC, Clock and TSI Colin Gay 2:10 - 4:00 - How each subsystem will be timed-in - Where dose B0 marker should get passed and checked? - Saving info about previous and/or next crossing? (ex: sum Et) SVX/SVT Gay/Culbertson COT/TDC/XFT/XTRP Pitts/Campbell/Winer/Kasten Calorimeter Shaw/Drake/Wilson/Truitt Muon/TDC/Muon Trg James 4:00 - 4:30 ** Coffee Break ** 4:30 - 6:00 Global trg/TSI Schmidt/Campbell Error detection, handling & recovery - Compile error list in each subsystem - Make criteria on error handling & recovery - Compile diagnostic readout list SVX/SVT Gay/Culbertson COT/TDC/XFT/XTRP Pitts/Campbell/Winer/Kasten Calorimeter Shaw/Drake/Wilson/Truitt Muon/TDC/Muon Trg James Global trg/TSI Schmidt/Campbell Time ==== 8:00pm - 10:00pm Breakout sessions (Groups should contact Myron or Jay for room reservation) Group 1 Lv2 interface boards & SVT/LV2 protocol Group 2 Luminosity Monitor, TOF electronics Group 3 Level 3 structure ********** * Oct 28 * ********** Time Session Chair ==== ============== 8:30 - 10:00 GWF & PJW Error detection, handling & recovery (continue) - Compile error list in each subsystem - Make criteria on error handling & recovery - Compile diagnostic readout list Calorimeter Shaw/Drake/Wilson/Truitt Muon/TDC/Muon Trg James Global trg/TSI Schmidt/Campbell 10:00 - 10:20 ** Coffee Break ** 10:20 - 12:00 Myron Level2 Trigger architecture - Finalize input list & Lv2 architecture - Address algorithm and software issues - Estimate Lv2 processing time (timing diagram) 12:00 - 1:00 ** Lunch ** 1:00 - 3:00 Kevin Level3 Trigger architecture - Compile input list (raw data + info passed from Lv1 & Lv2 trigger) - Discuss regional reconstruction - Address algorithm and software issues 3:00 - 3:20 ** Coffee Break ** 3:20 - 3:50 GWF - Ways of tapping out frontend signals (ex: use of scope card...) COT Pitts/VenBerg Calorimeter Nelson Time Session Chair ==== ============== 3:50 - 5:30 Jim Patrick Templates for Online software - Data taking - Online Monitoring (consumer processes) - Diagnostic - Debugging - Teststand 6:30 - Group Dinner ********** * Oct 29 * ********** 8:30 - 9:40 Infrastructure, System Control & Monitoring Steve Hahn - Review current specs & plans (power supply, rack monitoring) - Identify missing items 9:40 - 10:20 ** Coffee Break ** Time Session Chair ==== ============== 10:20 - 12:00 Jim Patrick Run Condition Database - Define structure, contents, size (trigger condition, calibration, pedestal, detector condition etc) - Hardware condition data base (FPGA, contents of FRAM etc) SVX/SVT Gay/Culbertson COT/TDC/XFT/XTRP Pitts/Campbell/Winer/Kasten Calorimeter Shaw/Drake/Wilson/Truitt Muon/TDC/Muon Trg James Global trg/TSI Schmidt/Campbell 12:00 - 1:00 ** Lunch ** Time Session Chair ==== ============== 1:00 - 4:40 Jay Chapman Review schedule & manpower for each subsystem - Go over task list and schedules for next one year - Identify tasks which need more manpower _ Job list data base 20 min/group * 11 = 220 min Online software, data storage Patrick FNAL(Electronics Infrastructure) DeMaat ANL/FNAL (Shower max/Hadron TDC) Drake/Lindgren U of Chicago (Lv1 decision, SVT) Mel Shochet Yale(Lv1 decision, TSI) Greg Feild Michigan 1 (Muon trigger) Chapman OSU/FNAL(XFT) Hughes Illinois (XTRP, Muon frontend) Kasten Michigan 2 (Lv2 trigger) Campbell PISA & Geneva (SVT) ?? MIT (ATM, event building, LV3) McFarland Time ==== 4:40 - 5:30 Workshop Summary (+ Bill's Top 10 problem list)