Copies of Talks presented at the review

  • Project Overview - Pat Lukens
  • Silicon Detector: Design and Scope - Brenna Flaugher
  • Silicon Detector: Cost and Schedule - Nicola Bacchetta
  • Preradiator replacement - Joey Huston
  • DAQ/Level 3 - Chistoph Paus
  • Calorimeter timing - Dave Toback
  • Installation - Rob Roser

  • Material for the April 2002 Director's Review

    Acquisition Execution Plan for both CDF and D0

    Draft of the Project Execution Plan

    Preliminary Hazard Assessment Plan

    The Basis of Estimate and complete WBS Dictionary

    High Level WBS Dictionary

    Mid Level WBS Dictionary

    Lowest Level WBS Dictionary

    Schedules - These are Gantt charts from each subproject schedule

    Silicon Detector Central Preshower
    Event Builder Electromagnetic calorimeter timing
    Installation Administration

    Schedule Files (11 April 2002) - These must be read in Microsoft Project 2000

    Silicon Detector Central Preshower
    Event Builder Electromagnetic calorimeter timing
    Installation Administration

    Most Recent (18 April 2002) Schedule Files - These must be read in Microsoft Project 2000

    Silicon Detector Central Preshower
    Event Builder Electromagnetic calorimeter timing
    Installation Administration

    Current version (April 2002) of the Technical Design Report

    PDF version Postscript version


    Report from the Committee

    Draft Report

    Responses

    Responses again in another format