Material for the July 2004 Director's Review

Charge for the review

Agenda for the review

Copies of Talks presented at the review

  • Introduction and Summary - Pat Lukens
  • Calorimeter Status and Installation Plans  - Steve Kuhlmann
  • Data Acquisition and Trigger Status and Scope - Peter Wilson
  • Installation, Maintenance and Shutdown Plans for 2004 & 2005 - Rob Roser
  • Breakout Sessions
    1. Installation and Shutdown Discussion (especially Calorimeter)
    2. Trigger and DAQ Scope Adjustments

    Additional Material

    Supporting Documentation for this review

    The WBS Dictionary (Baseline)

    High Level Calorimeter DAQ/Trigger

    Low Level Calorimeter DAQ/Trigger Administration Installation

    Current Baseline Schedule information from each of the subprojects

    Gantt Chart Milestones
    Calorimeter Calorimeter
    DAQ/Trigger DAQ/Trigger
    Administration
    Installation

    Schedule information for proposed new scope of the DAQ/Trigger subproject

    Gantt Chart Milestones Costs
    DAQ/Trigger DAQ/Trigger DAQ/Trigger


    Link to the Documents page

    Link to the Public Run IIb page - has links to older reviews


    Report from the Committee

    Membership: Joe Howell, George Ginther, Stephen Pordes, Mike Crisler

    Committee Report



    Last modified 15-July-04 by D. Benjamin