Supporting documentation for the July 2004 Director's Review

Material in support of scope changes
  1. Silicon support (long term)
  2. Silicon Vertex Trigger
  3. Track Trigger
  • Change Control Document #13 - for proposed Trigger/DAQ changes
  • Other Material

    Current version (September 2002) of the Technical Design Report

    1. Run IIb Silicon Detector Articles and Conference Proceedings
    2. EM timing Upgrade
    3. Report from CDF Internal DAQ review Oct 2003
    4. TDC's
    5. L2 Trigger
    6. Event Builder


    Last modified 19-July-04 by D. Benjamin