Supporting documentation for the July 2004 Director's Review
Material in support of scope changes
- Silicon support (long term)
- Silicon Vertex Trigger
- Track Trigger
Change Control Document #13 - for proposed Trigger/DAQ changes
Other Material
Current version (September 2002) of the Technical Design Report
- Run IIb Silicon Detector Articles and Conference Proceedings
- EM timing Upgrade
- Report from CDF Internal DAQ review Oct 2003
- TDC's
- L2 Trigger
- Event Builder
Last modified 19-July-04 by D.
Benjamin