Schedule for Commissioning of Barrel 4 Steve Blusk 16-Feb-2000 ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== **** Overall Barrel 4 Schedule at Lab C *** ================================================================================================================================== -Barrel 4 Testing on CMM5 ************ ================================================================================================================================== -Barrel 4 removed from CMM5 and moved to holding area. Prepare CMM-5 ***** for Barrel 1 ================================================================================================================================== -Barrel 4 tested with final port ***** cards and pigtails ================================================================================================================================== Barrel 4 moved to Lotema room for ******** ISL, L00 & Bm-Pipe Installation ================================================================================================================================== Barrel 4 back to Lab C for final assmebly ******** ================================================================================================================================== Barrel 4 goes to ***** B0 ================================================================================================================================== **** "Internal" Schedule for Installation and Integration of Barrel 4 Mechanical **** ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Cabling ------- Instrumentation --------------- -Install DIN rails & DIN connectors ********** on 1st floor, then at Alcove, then Det. ---------------------------------------------------------------------------------------------------------------------------------- -Pull and terminate cables from 1RR34C to ************* Detector and Alcove ---------------------------------------------------------------------------------------------------------------------------------- -Pull and terminate wires from PLC to 1RR34C and ************ ---------------------------------------------------------------------------------------------------------------------------------- -Pull and terminate wires in Alcove to transmitters ********* ---------------------------------------------------------------------------------------------------------------------------------- -Pull and terminate wires from Detector to detector transmitters ********* ---------------------------------------------------------------------------------------------------------------------------------- -30 deg. crack (RTDs) *********** ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Power Supply/FIB cables ----------------------- -Delivery ********** ---------------------------------------------------------------------------------------------------------------------------------- -Installation ************ ---------------------------------------------------------------------------------------------------------------------------------- RTD & RH Sensing ---------------- -Delivery ************* ---------------------------------------------------------------------------------------------------------------------------------- -Installation ***** ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== CPC Pigtail(PCP) ---------------- -PCP Designed ****** ---------------------------------------------------------------------------------------------------------------------------------- -PCP Fabrication ******** ---------------------------------------------------------------------------------------------------------------------------------- -PCP Assembled and attached *** to CPC ---------------------------------------------------------------------------------------------------------------------------------- -PCP cables ord- *************** ered and assembled ---------------------------------------------------------------------------------------------------------------------------------- -JBA Designed **** ---------------------------------------------------------------------------------------------------------------------------------- -JBA Ord & Deliv ******** ----------------------------------------------------------------------------------------------------------------------------------1 -Test PCP/JBA with Test Junction Board *** ---------------------------------------------------------------------------------------------------------------------------------- -Test PCP/JBA with Pre-Prod Junction Board *** ---------------------------------------------------------------------------------------------------------------------------------- -Test PCP/JBA with Prod Junction Board *** ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Junction Board(JB) ------------------ -Design Pre- Prod Board ********** ---------------------------------------------------------------------------------------------------------------------------------- -PreProd Fab, Assembly ********** ---------------------------------------------------------------------------------------------------------------------------------- -Test PP JB *** ---------------------------------------------------------------------------------------------------------------------------------- -Design Prod JB ****** ---------------------------------------------------------------------------------------------------------------------------------- -Fab & Assemble Prod. JB ********* ---------------------------------------------------------------------------------------------------------------------------------- -Test Prod JB ***** with PCP ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Power Supplies -------------- -Delivery ************************************************** ---------------------------------------------------------------------------------------------------------------------------------- -Ready for Issue ************************************************** ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Port Cards ---------- ---------------------------------------------------------------------------------------------------------------------------------- Prepare 8 CPC's for B4 (except PCP) ******** ---------------------------------------------------------------------------------------------------------------------------------- Solder 8 PCP's to 8 CPC's (for B4) *** ---------------------------------------------------------------------------------------------------------------------------------- 4 CPC's ready for Barrel 1 **** testing ---------------------------------------------------------------------------------------------------------------------------------- Full prod of CPC's ********************************>>> for SVXII ---------------------------------------------------------------------------------------------------------------------------------- ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Cooling System -------------- ---------------------------------------------------------------------------------------------------------------------------------- -Piping & Instrumentation incl. Detector ******************** & Alcove ---------------------------------------------------------------------------------------------------------------------------------- -Plumb all X-mitrs ********** into cooling system ---------------------------------------------------------------------------------------------------------------------------------- -30 deg. crack tubes and manifold ****** ---------------------------------------------------------------------------------------------------------------------------------- -Piping from wall to Detector in ******** Asmbly Hall ---------------------------------------------------------------------------------------------------------------------------------- -Leak checks ***** ---------------------------------------------------------------------------------------------------------------------------------- -Write PID loops for cooling control ****** at lab C ---------------------------------------------------------------------------------------------------------------------------------- -Plumb Barrel4 and Leak check **** ---------------------------------------------------------------------------------------------------------------------------------- -Tune PID loops and cooling ****** parameters ---------------------------------------------------------------------------------------------------------------------------------- -Gas seal checks, N_2 tests, ***** condensation tests ================================================================================================================================== Item | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | 2000 ================================================================================================================================== Interlocks ---------- ---------------------------------------------------------------------------------------------------------------------------------- -All components PC ordered & at B0 ************ ***** ---------------------------------------------------------------------------------------------------------------------------------- -PLC Interlock coding *********************** ---------------------------------------------------------------------------------------------------------------------------------- -PS control C/Java coding *********************** ---------------------------------------------------------------------------------------------------------------------------------- -iFix coding *********************** ---------------------------------------------------------------------------------------------------------------------------------- -Failure mode ********** analysis ----------------------------------------------------------------------------------------------------------------------------------