CLC HV Instructions for the Shift Crew
-
At the moment (4/6/01) the CLC is still under expert's control
-
The IFIX implementation is under development (pleaee contact Andrea Bocci @ Rockefeller)
-
We normally leave the HV ON all the time, even during injection and
beam dump. No trips have been noticed so far.We'll revise this if needed.
-
The PC that controls and monitors the HV is on the third floor of B0.